Trail: Creating a GUI with JFC/Swing
|
Lesson: Using Swing Components
|
|
How to Monitor Progress
Sometimes a task running within a program
might take a while to complete.
A user-friendly program provides some
indication to the user
about how long the task might take and
how much work has already been done.
Swing provides three classes to help you
create GUIs that monitor and display the progress
of a long-running task:
-
JProgressBar - A visible component to graphically display
how much of a total task has completed.
See How to Use Progress Bars
for information and an example of using a progress bar.
-
ProgressMonitor - Not a visible component.
Instead, an instance of this class
monitors the progress of a task and
pops up a dialog if necessary.
See How to Use Progress Monitors
for details and an example of using a progress monitor.
-
ProgressMonitorInputStream - An input stream with an attached progress monitor,
which monitors reading from the stream.
You use an instance of this stream like any of the other
input streams described in
Reading and Writing
.
You can get the stream's progress monitor
with a call to getProgressMonitor
and configure it as described in
How to Use Progress Monitors.
After you see a progress bar and a progress monitor in action,
Deciding Whether to Use a Progress Bar or a Progress Monitor
can help you figure out which is appropriate for your application.
How to Use Progress Bars
Here's a picture of a small demo application that
uses a progress bar to measure the progress of a task
that runs in its own thread:
Try this:
- Compile and run the application.
The main source file is
ProgressBarDemo.java.
You will also need
LongTask.java and
SwingWorker.java.
See Getting Started with Swing if you need help compiling or running this application.
Note:
The tutorial's implementation of the
SwingWorker
class was updated in the January 1999 release of the tutorial; the class
has been enhanced to allow programs to safely interrupt the thread.
If you are using SwingWorker in any of
your programs, make sure you are using the most up-to-date version!
- Push the Start button.
Watch the progress bar as the task makes progress.
The task displays its output in the text area
at the bottom of the window.
Below is the code from
ProgressBarDemo.java
that creates and sets up the progress bar:
//Where member variables are declared:
JProgressBar progressBar;
//...in the constructor for the demo's frame:
progressBar = new JProgressBar(0, task.getLengthOfTask());
progressBar.setValue(0);
progressBar.setStringPainted(true);
The constructor that creates the progress bar
sets the progress bar's minimum and maximum values.
You can also set these values with setMinimum
and setMaximum.
The minimum and maximum values used in this program are 0 and the
length of the task, which is typical of many programs and tasks.
However, a progress bar's minimum and maximum
values can be any value, even negative.
The code snippet also sets the progress bar's current value to 0.
The call to setStringPainted
causes the progress bar to display, within its bounds,
a textual indication of the percentage of the task that has completed.
By default, the progress bar displays the value
returned by its getPercentComplete method
formatted as a percent, such as 33%.
Alternatively, you can replace the default with a different
string by calling setString. For example,
if (/*...half way done...*/)
progressBar.setString("Half way there!");
You start this example's task by clicking the Start button.
Once the task has begun, a timer
(an instance of the
Timer class)
fires an action event every second.
Here's the ActionPerformed method of
the timer's action listener:
public void actionPerformed(ActionEvent evt) {
progressBar.setValue(task.getCurrent());
taskOutput.append(task.getMessage() + newline);
taskOutput.setCaretPosition(taskOutput.getDocument().getLength());
if (task.done()) {
Toolkit.getDefaultToolkit().beep();
timer.stop();
startButton.setEnabled(true);
progressBar.setValue(progressBar.getMinimum());
}
}
The bold line of code gets the amount of work completed by the
task and updates the progress bar with that value.
So this example's progress bar measures
the progress made by the task each second,
not the elapsed time.
The rest of the code appends a message to the output log
(a text area named taskOutput) and,
if the task is done, turns the timer off
and resets the other controls.
As mentioned, the long-running task in this program runs
in a separate thread.
Generally, it's a good idea to isolate a potentially long-running
task in its own thread so that the task doesn't block the rest of the program.
The long-running task is implemented
by LongTask.java,
which uses a SwingWorker
to ensure that the thread runs safely.
See
Using the SwingWorker Class
in Threads and Swing
for information about the SwingWorker class.
How to Use Progress Monitors
Now let's rewrite the previous example to use a progress
monitor instead of a progress bar.
Here's a picture of the new demo program,
ProgressMonitorDemo.java:
[PENDING: the dialog probably should have labels]
Try this:
- Compile and run the application.
The main source file is
ProgressMonitorDemo.java.
You will also need
LongTask.java and
SwingWorker.java.
See Getting Started with Swing if you need help compiling or running this application.
- Push the Start button.
After a certain amount of time, the program displays a progress dialog.
- Click the OK button.
Note that the task continues even though the dialog is gone.
- Start another task. After the dialog pops up,
click the Cancel button.
The dialog goes away and the task stops.
A progress monitor cannot be used again, so a new
one must be created each time a new task is started.
This program creates a progress monitor each time the
user starts a new task with the Start button.
Here's the statement that creates the progress monitor:
progressMonitor = new ProgressMonitor(ProgressMonitorDemo.this,
"Running a Long Task",
"", 0, task.getLengthOfTask());
This code uses ProgressMonitor's only constructor
to create the monitor and
initialize several arguments:
- The first argument provides the parent component to
the dialog popped up by the progress monitor.
- The second argument is a string that describes
the nature of the task being monitored.
This string is displayed on the dialog.
see The Progress Monitoring API
for details about this argument.
- The third argument is another string
that provides a changeable status note.
The example uses an empty string to indicate that
the dialog should make space for a changeable status note,
but that the note is initially empty.
If you provide
null for this argument,
the note is omitted from the dialog.
The example updates the note
each time the timer fires an action event.
It updates the monitor's current value at the same time:
progressMonitor.setNote(task.getMessage());
progressMonitor.setProgress(task.getCurrent());
- The last two arguments provide the minimum and maximum
values, respectively, for the progress bar displayed in the dialog.
After the example creates the progress monitor,
it configures the monitor further:
progressMonitor.setProgress(0);
progressMonitor.setMillisToDecideToPopup(2 * ONE_SECOND);
The first line sets the current position
of the progress bar on the dialog.
The second tells the progress monitor
to wait two seconds before deciding whether to bring up a dialog.
If, after two seconds, the progress monitor's progress
is less than its maximum, the monitor will bring up the dialog.
By the simple fact that this example uses a progress monitor,
it adds a feature that wasn't present in the version of the
program that uses a progress bar.
The user can cancel the task by clicking the Cancel
button on the dialog.
Here's the code in the example that checks
to see if the user canceled the task or if the task exited normally:
if (progressMonitor.isCanceled() || task.done()) {
progressMonitor.close();
task.stop();
Toolkit.getDefaultToolkit().beep();
timer.stop();
startButton.setEnabled(true);
}
Note that the progress monitor doesn't itself cancel the task.
It provides the GUI and API to allow the program to do so easily.
Deciding Whether to Use a Progress Bar or a Progress Monitor
Use a progress bar if:
- You want more control over the configuration of the progress bar.
If you are working directly with a progress bar,
you can make it display vertically,
you can provide a string for it to display,
you can register change listeners on it,
and you can provide it with a bounded range model to control
the progress bar's minimum, maximum, and current values.
- The program needs to display other components
along with the progress bar.
- You need more than one progress bar.
With some tasks, you need to monitor more than one parameter.
For example, an installation program might monitor
disk space usage in addition to how many files
have been successfully installed.
- You need to reuse the progress bar.
A progress bar can be reused; a progress monitor cannot.
Once the progress monitor has decided to display a dialog (or not),
the progress monitor cannot do it again.
Use a progress monitor if:
- You want an easy way to display progress
in a dialog.
- The running task is secondary and
the user might not be interested in the progress of the task.
Progress monitor provides a way for the user to
dismiss the dialog while the task is still running.
- The task can be cancelled.
Progress monitor provides a GUI for the user to cancel the task.
All you have to do is
call progress monitor's
isCanceled method to find out
if the user pressed the Cancel button.
- Your task displays a short message periodically while running.
The progress monitor dialog provides the
setNote
method so that the task can provide further information about what
it's doing. For example, an installation task might report the
name of each file as it's installed.
- The task might not take a long time to complete.
You decide at what point a running task is taking
long enough to warrant letting the user know about it.
Progress monitor won't pop up a dialog if the task completes
within the timeframe you set.
If you decide to use a progress monitor and
the task you are monitoring is reading from an input stream,
use the ProgressMonitorInputStream class.
The following tables list the commonly used
API for using progress bars and progress monitors.
Because JProgressBar is a subclass of
JComponent,
other methods you are likely to call on a
JProgressBar
are listed in
The JComponent Class.
Note that
ProgressMonitor is a subclass of Object
and is not a visual component.
The API for monitoring progress
falls into these categories:
Creating the Progress Bar
| Constructor
|
Purpose
|
JProgressBar()
JProgressBar(int min, int max)
|
Create a horizontal progress bar.
The default constructor initializes the progress bar with
a minimum and initial value of 0 and a maximum of 100.
Use the min and max
arguments to specify other values.
|
JProgressBar(int orientation)
JProgressBar(int orientation, int min, int max)
|
Create a progress bar with the specified orientation,
which can be either
JProgressBar.HORIZONTAL or
JProgressBar.VERTICAL.
Use the min and max
arguments to specify minimum and maximum values.
|
JProgressBar(BoundedRangeModel)
|
Create a horizontal progress bar with the specified range model.
|
Setting or Getting the Progress Bar's Constraints/Values
| Method or Constructor
|
Purpose
|
void setValue(int)
int getValue()
|
Set or get the current value of the progress bar.
The value is constrained by the minimum and maximum values.
|
double getPercentComplete()
|
Get the percent complete for the progress bar.
|
void setMinimum(int)
int getMinimum()
|
Set or get the minimum value of the progress bar.
|
void setMaximum(int)
int getMaximum()
|
Set or get the maximum value of the progress bar.
|
void setModel(BoundedRangeModel)
BoundedRangeModel getMaximum()
|
Set or get the model used by the progress bar. The model
establishes the progress bar's constraints and values.
So you can use this method as an alternative to using the
individual set/get methods listed above.
|
Fine Tuning the Progress Bar's Appearance
| Method
|
Purpose
|
void setOrientation(int)
int getOrientation()
|
Set or get whether the progress bar is vertical or horizontal.
Acceptable values are JProgressBar.VERTICAL or
JProgressBar.HORIZONTAL.
|
void setBorderPainted(boolean)
boolean isBorderPainted()
|
Set or get whether the progress bar has a border.
|
void setStringPainted(boolean)
boolean isStringPainted()
|
Set or get whether the progress bar displays a percent string.
By default, the value of the percent string is the value returned
by getPercentComplete formatted as a percent.
You can set the string to be displayed with setString.
|
void setString(String)
String getString()
|
Set or get the percent string.
|
Creating the Progress Monitor
| Method or Constructor
|
Purpose
|
ProgressMonitor(Component, Object, String, int, int)
|
Create a progress monitor.
The Component argument is the parent
for the monitor's dialog.
The Object argument is a message to
put on the option pane within the dialog.
The value of this object is typically a String.
The String argument is a changeable status note.
The final two int arguments set the
minimum and maximum values, respectively,
for the progress bar used in the dialog.
|
ProgressMonitor getProgressMonitor()
(in ProgressMonitorInputStream)
|
Gets a progress monitor that monitors reading from an input stream.
|
Configuring the Progress Monitor
| Method
|
Purpose
|
void setMinimum(int)
int getMinimum()
|
Set or get the minimum value of the progress monitor.
This value is used by the monitor to set up the progress bar in the dialog.
|
void setMaximum(int)
int getMaximum()
|
Set or get the maximum value of the progress monitor.
This value is used by the monitor to set up the progress bar in the dialog.
|
void setProgress(int)
|
Update the monitor's progress.
|
void setNote(String)
String getNote()
|
Set or get the status note.
This note is displayed on the dialog.
To omit the status note from the dialog,
provide null as the third argument
to the monitor's constructor.
|
void setMillisToDecideToPopup(int)
int getMillisToDecideToPopup()
|
Set or get the time after which the monitor should decide whether
to popup a dialog.
|
Terminating the Progress Monitor
| Method
|
Purpose
|
close()
|
Close the progress monitor. This disposes of the dialog.
|
boolean isCanceled()
|
Determine whether the user pressed the Cancel button.
|
This table shows the examples that use JProgressBar,
ProgressMonitor, or ProgressMonitorInputStream,
and where those examples are described.
| Example
|
Where Described
|
Notes
|
ProgressBarDemo
|
This section and
How to Use Timers
|
Uses a basic progress bar to show progress
on a task running in a separate thread.
|
ProgressMonitorDemo
|
This section
|
Modification of the previous example that uses
a progress monitor instead of a progress bar.
|
|